How to Transfer a Fixed Concrete Pump from One Site to Another

Fixed concrete pumps, also known as stationary concrete pumps, are essential for large-scale construction projects that require the continuous pumping of concrete over a long distance. These pumps are typically installed in a fixed location, and their operation depends on a series of hoses or pipelines that direct the concrete to the desired point. While fixed concrete pumps are designed for stationary use, there are times when they need to be transferred from one construction site to another. Transferring a fixed concrete pump requires careful planning, preparation, and execution to ensure that the equipment is safely moved without causing damage or compromising its functionality. In this passage, we will explore how to transfer a fixed concrete pump from one site to another, detailing key considerations and practical steps involved.



Preparation Before the Transfer


Before initiating the transfer of a fixed concrete pump, thorough preparation is crucial to ensure that the process is smooth, safe, and efficient. The following steps should be considered before the move begins:


Assessing the Pump and Site Conditions

First, inspect the fixed concrete pump and ensure that it is ready for transport. Check the condition of the pump, the concrete delivery pipeline, and all accessories. If the pump has been used extensively, it’s a good idea to perform any maintenance tasks to ensure it is in optimal working condition before the move. Also, evaluate the new site to determine any obstacles that could affect the transfer process, such as narrow access roads, steep terrain, or limited space for unloading.


Disassemble and Disconnect

To prevent damage during transport, certain components of the fixed concrete pump must be disassembled or disconnected. This may include:

Hoses and Pipes: Detach the concrete delivery hoses and any pipes connected to the pump. If the pump uses a long pipeline, you may need to disconnect the sections and prepare them for transport separately.

Electrical Connections: Disconnect any electrical wiring, including power cables, control panels, and safety features.

Hydraulic Lines: If the pump relies on hydraulic systems for operation, ensure all hydraulic lines are disconnected to prevent leaks or damage during transport.


Drain the Pump and Pipes

To prevent any residual concrete from hardening inside the pump or pipes during transport, thoroughly clean and drain the system. This is particularly important if the pump is being moved a long distance or if it will be idle for a period before use at the new site. Using water or a cleaning solution, flush out any remaining concrete slurry to ensure that the pump and its components are free of concrete buildup.


Choosing the Right Transport Method


The next step in transferring a fixed concrete pump is choosing the most appropriate method for moving the equipment. Depending on the size of the pump, the distance to be traveled, and the type of terrain between the old and new sites, there are different transport methods that can be used.


Flatbed Truck

For many fixed concrete pumps, transporting them via a flatbed truck is the most common method. Flatbed trucks provide a stable platform for large, heavy equipment, and they allow easy loading and unloading. The concrete pump and its components should be securely fastened to the flatbed to prevent shifting during transport. Additionally, it may be necessary to use ramps or cranes to lift the pump onto the truck bed, especially if the pump is large and heavy.


Lowboy Trailer

If the fixed concrete pump is particularly heavy or oversized, a lowboy trailer may be required. Lowboy trailers have a low deck height, which helps accommodate taller or heavier equipment without exceeding height restrictions during transport. These trailers are ideal for moving large concrete pumps that need extra stability and secure transportation over long distances.


Crane or Forklift

In some cases, cranes or forklifts are required to lift the pump off the ground and onto the transport vehicle. A mobile crane or a forklift with a high lifting capacity can be used to move the pump from the construction site to the transport vehicle. Ensure that the lifting equipment has a safe working load capacity that can handle the weight of the pump.


Securing the Concrete Pump for Transport


Properly securing the fixed concrete pump during transport is crucial to prevent damage to both the pump and the transport vehicle. There are several ways to secure the pump:


Straps and Chains

Heavy-duty straps or chains should be used to secure the concrete pump to the transport vehicle. The straps should be positioned to evenly distribute the weight and prevent the pump from shifting or toppling during transit. Additionally, make sure the straps or chains are tensioned correctly to avoid loosening during the journey.


Support Blocks and Padding

To further ensure the pump’s stability during transport, support blocks can be placed underneath the pump to distribute the weight evenly. Padding or cushioning materials can also be used to protect the pump’s surfaces from scratches or dents. This is particularly important for sensitive components like the hydraulic pump, motor, and electrical wiring.


Transporting the Fixed Concrete Pump


Once the pump is securely loaded onto the transport vehicle, it’s time for the transfer to the new site. The transportation process should be carried out with care to avoid sudden stops, sharp turns, or excessive vibration, which could damage the pump.


Driving Considerations

When transporting a heavy piece of equipment like a fixed concrete pump, it’s important to drive cautiously. Avoid sudden movements or aggressive driving. Drive at moderate speeds, and ensure that all road conditions are safe for heavy equipment transport. If traveling on highways, ensure that the vehicle is clearly marked with proper warning signs, such as oversized load signs, to notify other drivers of the load.


Weather Conditions

Weather can also impact the transport process. For instance, rain or snow can create slippery conditions, making it more difficult to drive safely with heavy equipment. If possible, monitor weather forecasts before beginning the transport and plan the trip when conditions are most favorable.


Unloading and Reassembling at the New Site


Upon arrival at the new construction site, the process of unloading the fixed concrete pump and reassembling it begins.


Unloading the Pump

Use cranes, forklifts, or other appropriate lifting equipment to unload the pump from the transport vehicle. Ensure that the unloading process is carried out in a controlled manner to prevent the pump from falling or shifting. Position the pump carefully on level ground, making sure it is stable and secure.


Reassemble the Pump

Once the pump is unloaded, reassemble all the disconnected components. This includes reconnecting hoses, pipes, electrical lines, and hydraulic systems. Be sure to check all connections for leaks or damage, and ensure that the pump is ready for operation. Perform any necessary testing to ensure that all components are functioning correctly before beginning concrete pumping at the new site.


Post-Transfer Inspection


After the pump is reassembled, a post-transfer inspection is critical to ensure that the equipment is in good working condition. Check for any signs of damage that may have occurred during transport and make sure the pump’s key components, such as the motor, hydraulic system, and concrete delivery line, are functioning properly.




Transferring a fixed concrete pump from one construction site to another requires careful planning and execution to ensure that the equipment arrives safely and is ready for use at its new location. By properly preparing the pump, selecting the right transport method, securing the pump during transit, and performing a thorough reassembly at the new site, you can ensure that the transfer is successful and that the concrete pump continues to operate efficiently. Always prioritize safety, and consider consulting professionals if the pump is particularly large or complex to move. With the right approach, transferring a fixed concrete pump can be a straightforward task that keeps your construction project on track and on schedule.