Can a 160 TPH Asphalt Batch Plant Support Dual Paving Teams Working on 2 Parallel Lanes Simultaneously?
- aimixglobal5
- 2 days ago
- 3 min read
In large-scale road construction projects, time and efficiency are everything. If you're planning dual-lane paving with two teams working side by side, choosing the right asphalt mixing plant is a strategic decision. A 160 TPH (tons per hour) asphalt batch mix plant for sale often stands out as a mid-to-high capacity choice—but is it enough to handle simultaneous operations? In this article, we explore the practical capacity of a 160 TPH asphalt batch plant, paving demands, and what you should consider before making an investment.

Understanding the Actual Output of a 160 TPH Asphalt Batch Plant
Let’s start by clarifying what 160 TPH really means. On paper, it refers to the asphalt manufacturing plant’s maximum theoretical output under ideal conditions—160 tons of asphalt per hour. However, real-world conditions such as aggregate moisture, mix type, fuel quality, and operator experience will affect the actual hourly production. Most contractors can expect a consistent real output between 130 to 150 tons per hour in field conditions.
Batch vs. Drum: Why It Matters Here
Because asphalt batch plants operate in cycles, they offer flexibility in mix design and quality control. For dual paving crews, this flexibility ensures each team can receive tailored mix specifications, even during high-demand hours. While drum mix plants may offer higher continuous output, batch plants are better suited for projects requiring precision and multiple mix types across two lanes.
How Much Asphalt Do Two Paving Teams Really Need?
Before deciding whether a 160 TPH plant is sufficient, let’s estimate the asphalt consumption rate of two paving crews working in parallel:
Typical paving width per team: 3.5 meters
Layer thickness: 5 cm (0.05 m)
Paving speed: 5 meters per minute
Asphalt volume per minute per team = 3.5 m × 0.05 m × 5 m = 0.875 m³ At 2.4 tons/m³ (asphalt density), this equals 2.1 tons/minute per team.
For two teams: 2.1 × 2 = 4.2 tons/minute = 252 tons/hour.
This calculation shows that to fully support both paving teams without delay, a plant would need to produce around 250 tons per hour—significantly higher than the practical output of a 160 TPH asphalt batch plant.

Is a 160 TPH Asphalt Plant Still a Good Option?
Although a 160 TPH asphalt batch plant may not fully meet the demands of two paving teams at maximum speed, it can still be effective under the right conditions. For example:
If paving speed is reduced or staged
If the paving layers are thinner
If one team starts slightly earlier or later to stagger demand
If there is adequate hot mix asphalt storage in silos
In such scenarios, a 160 TPH hmp plant can serve two teams efficiently with minor adjustments. It also provides a cost-effective balance between performance and investment, especially for regional contractors managing medium- to large-scale projects.
Other Key Considerations Before You Decide
Beyond raw capacity, several other factors influence whether a 160 TPH plant will fit your project:
1. Distance Between Plant and Paving Site
If your job site is far from the mixing plant, transportation time becomes critical. Long travel distances may cause delivery delays, making it harder to support two teams in parallel without mix cooling or interruptions.
2. Silo Capacity and Truck Dispatching
A larger hot mix storage silo (≥30 tons) allows for buffer storage, ensuring continuous delivery. Also, a well-coordinated fleet of dump trucks is essential to support uninterrupted paving.
3. Local Climate and Temperature Loss
Asphalt must be laid at specific temperatures. In cooler climates or during night paving, temperature loss during transit becomes a real issue. A high-output plant helps reduce these risks by shortening delivery intervals.

When Should You Consider a Higher Capacity Plant?
If your project consistently requires over 220 tons/hour of mix—especially for dual lane expressways, airports, or time-sensitive highways—you may want to consider upgrading to a 200+ TPH plant. However, that comes with a higher initial cost, greater fuel consumption, and more complex logistics.
Final Thoughts: Plan According to Your Project Demands
So, can a 160 TPH asphalt batch plant support dual paving teams working on two parallel lanes? The answer depends on your paving speed, mix design, logistics, and coordination. For moderate paving speeds or staggered team schedules, yes—it can be a reliable and cost-effective solution. But for full-speed dual-lane paving, especially on tight timelines, a higher-capacity plant may be worth considering.

Why Work With Us?
At AIMIX, we help our clients in Indonesia and worldwide choose the right asphalt mixing solutions tailored to their project goals. With 160 TPH, 200 TPH, and mobile options available, we offer plants that balance performance, cost, and flexibility. Our local engineers and after-sales team ensure that your plant runs smoothly from setup to production.
Contact us today to get tailored advice, plant layout design, and a quick quote based on your paving requirements. Let’s build better roads—together.
Comments